Engineers on call 24/7

Trusted by 500+ businessesenquiries@techniheat.co.uk

Case study · Golf Clubs

Heating and cooling a clubhouse with minimum disruption

Withington Golf Club

Heating and cooling a clubhouse with minimum disruption0visible vents

The challenge

The club wanted heating and cooling in the clubhouse that worked well, was easy to use and didn't spoil the room.

What we did

  • Survey and design
  • Installation around club use
  • User-friendly controls
  • Handover

The result

The room warms up quickly, cooling is effective, controls are simple and the vents are hardly noticeable.

“The heating warms up the room quickly and the cooling is very effective when needed, with the temperature controls being very user friendly.”House Chairman, Withington Golf Club

24 hours · 365 days

Plant down? We'll usually be there within two hours.

Call 24/7Report a fault
Concept design · not the official website