Engineers on call 24/7

Trusted by 500+ businessesenquiries@techniheat.co.uk

Case study · Commercial

Getting a Peak District business through the 2010 deep freeze

Allan Popplewell, Operations, Peak District business

Getting a Peak District business through the 2010 deep freeze~10 yrspartnership

The challenge

Deep in the Peak District, a winter heating fault quickly becomes an emergency. The 2010 freeze caused substantial frost damage to the system.

What we did

  • Engineers on site in time to limit the damage
  • Stayed until the situation was stable
  • Returned to complete repairs
  • Modified the system to prevent it happening again

The result

The business kept running despite major frost damage, and the system has been modified so it won't happen again.

“They are big enough to provide a rapid and cost-effective response but small enough to know each of their customers' needs and priorities. I cannot recommend them highly enough!”Allan Popplewell

24 hours · 365 days

Plant down? We'll usually be there within two hours.

Call 24/7Report a fault
Concept design · not the official website